Creating strong foundations for future generations
This critical phase involved precise sequencing and strict adherence to programme requirements, including the installation of 375 foundation piles, each 450mm in diameter and drilled to depths of up to 16 metres using our Soilmec SR45 drilling rig.
Our team worked collaboratively throughout, maintaining consistently high standards of precision and quality. Through structured scheduling, effective interface management, and a strong safety culture, we delivered the works in full alignment with project specifications. Despite the characteristically changeable Cornish weather, operations remained on schedule — a credit to the team’s adaptability and commitment. A big thank you to everyone involved for their technical expertise and reliable execution.
For piling enquiries, please contact us