Foundation Piling Load out of Stafford
After successfully installing over 1,500 piles ranging from 450mm to 500mm in diameter with 1050mm-diameter flared heads, reaching depths of up to 29 metres, it’s time to move on to the next project.
While completing the piling works is a significant milestone, the challenge doesn’t stop there. The safe and efficient load-out of two Soilmec SR95 rigs requires just as much planning, coordination, and teamwork. Delivering results at this scale is only possible through collaboration and expertise.
1,500+ piles installed.
Next challenge: Mobilising two piling rigs to their next destination
Full video of the two machines loading out with a police escort is available on Foundation Piling Linkedin page.
https://www.linkedin.com/company/foundation-piling
If you have a project requiring piling, please contact us at enquiries@foundation-piling.co.uk